The Waste Age:

In Aotearoa NZ:
• New Builds in Akl produce 570,000 tonnes of waste
• CDW contributes to 50% of landfill volume
• Every new house produces 4.5t of waste, apartment blocks more
• In contracting, EoT claims often more expensive than material over-supply: PGCert in PM research?
• Waste Levies ($10/t) in AKL a joke compared to LDN ($100/t)
• Deconstruct don’t demolish
• Digital off-site prefabrication CLT has minimal waste
• Fly-tipping problem / Litter Act ineffective
• NZL is not green by design but by accident